Design and development of an extensive vapour bleeding system at the evaporators

K.S.Venkatesh, Aashis S.Roy


The improvement of the co-generation plant in sugar factories and selling additional power to the national grid may be possible. This generates additional revenue in the sugar mills. The steam demand in process can be minimized by secondary power production in the co-generation plant. The secondary power production in the co-generation plant can be achieved in online process by employing extensive vapour bleeding systemat the evaporators for secondary heating of cane juice (85-110ï‚°C). The annual saving achieved was Rs.11.00million. This required an investment of Rs.6.50 million, which had an attractive simple payback period of 8 months.


Isenção de responsabilidade: Este resumo foi traduzido usando ferramentas de inteligência artificial e ainda não foi revisado ou verificado

Indexado em

  • CASS
  • Google Scholar
  • Abra o portão J
  • Infraestrutura Nacional de Conhecimento da China (CNKI)
  • CiteFactor
  • Cosmos SE
  • Diretório de indexação de periódicos de pesquisa (DRJI)
  • Laboratórios secretos de mecanismos de pesquisa
  • ICMJE

Veja mais

Flyer